Local Utilities


Annual Drinking Water Quality Report – Click Here

Water and Wastewater Compliance Officer: Jill Walling
Utility Superintendent: Ken Winkles

Falkville Utilities: 256.784.5922

Click here to download an application for obtaining water service.

Click here to read ORDINANCE NUMBER 2006-02.

Payments on Utility Bill can be made at the Falkville Municipal Building in the front office, night drop, or by mail at P. O. Box 407, Falkville, AL 35622. You may also use credit cards to make payments. Visit www.falkvillepayments.com or use the toll free number 1-877-748-6252.

If you have any questions concerning your utility bill, or services feel free to contact town hall.

If you see standing or running water around a meter, edge of roadway or sidewalk please call and report it to town hall.

Morgan County Commission Shops:

  • Morgan County Commission Chairman: Ray Long (256) 351-4730
  • District 1: Jeff Clark (256) 353-8783
  • District 2: Randy Vest (256) 773-7383
  • District 3: Don Stisher (256) 784-5476
  • District 4: Greg Abercrombie (256) 778-8515

Quick Numbers:

  • Morgan County Sanitation: (256) 773-3887 or 1-800-847-3750
  • Morgan County Health Department: (256) 353-7021
  • Morgan County Courthouse: (256) 351-4600
  • Wheeler Basin Gas: (256) 552-2300

Joe Wheeler EMC
Wheeler Basin Natural Gas

Water & Sewer Rate Schedule:

WATER

INSIDE TOWN LIMITS

RATES SEWER

INSIDE TOWN LIMITS

RATES
Residential (3/4” or 1” meters):

First 2,000 gallons or less
Over 2,000 gallons (per 1,000 gal.)

-
-
$16.36
$ 4.22
Gravity sewer:

First 1,500 gallons
Over 1,500 gallons (per 1,000 gal.)

-
-
$18.04
$ 1.39
Commercial (3/4” or 1” meters):

First 3,000 gallons or less
Next 11,000 gallons (per 1,000 gal.)
Over 14,000 gallons (per 1,000 gal.)

-
-
$22.06
$ 4.22
$ 2.99
Discount customers with grinder pumps:

First 1,500 gallons or less
Over 1,500 gallons (per 1,000 gal.)

-
-
-
$18.04
$ 1.39
All 2” meters:

First 10,000 gallons or less
Over 10,000 gallons (per 1,000 gal.)

-
-
$81.77
$ 3.10

1. For Sewer tap of 4” $400.00 plus actual cost of materials

2. For Sewer tap over 4” $450.00 plus cost of materials

 
All meters over 2”:

First 35,000 gallons or less Over 35,000 gallons (per 1,000 gal.)

-
-
$177.81
$ 3.10
3. Base fee includes labor and equipment 4. Actual  costs of materials will be calculated semi-annually  
The minimum charges, as provided in the rate schedule, shall be made for each connection through a single delivery and metering point per metering period (one month).   Title: Cost Overruns : With regard to both water and sewer taps, in instances of extraordinary circumstances which cause the Town’s actual expense to be higher than the amount charged by the schedule, the customer shall pay the actual, documented additional expense. Examples of such circumstances include, but are not limited to boring, material and outside contractor cost where the particular installation is more costly than normal due to rock, boring requirements and other such exceptional conditions or circumstances.   
WATER

OUTSIDE TOWN LIMITS

RATES SEWER

OUTSIDE TOWN LIMITS

RATES
Residential (3/4” or 1” meters):

First 2,000 gallons or less
Over 2,000 gallons (per 1,000 gal.)

-
-
$20.39
$ 5.08
Gravity sewer:

First 1,500 gallons
Over 1,500 gallons (per 1,000 gal.)

-
-
$20.81
$ 1.53
Commercial (3/4” or 1” meters):

First 2,000 gallons or less Next 11,000 gallons (per 1,000 gal.)
Over 13,000 gallons (per 1,000 gal.)

-
-
$31.22
$ 4.58
$ 3.22
Discount customers with grinder pumps:

First 1,500 gallons or less
Over 1,500 gallons (per 1,000 gal.)

-
-
$20.81
$ 1.53
All meters over 2”:

First 10,000 gallons or less Over 10,000 gallons (per 1,000 gal.)

-
-
$94.17
$ 3.53
   
All meters over 2”:

First 35,000 gallons or less
Over 35,000 gallons (per 1,000 gal.)

-
-
$190.21
$ 3.53
Water Tape Fees

1. 5/8″ and 3/4″ meter
2. 1″ meter
3. 2″ and above actual cost

-
$300.00
$350.00
$400.00

The minimum charges, as provided in the rate schedule, shall be made for each connection through a single delivery and metering point per metering period (one month).   4. Base fee includes labor and equipment.

5. Actual cost of materials will be adjusted semi-annually